Activity Log
12 entries
- 10:02:41Edge
Critical hotspot detected on Panel ID 23 (72.4 °C)
- 10:02:38Robot
ArUco marker ID 23 read, panel validation successful
- 10:01:12Robot
Arrived at waypoint 3 — Main Panel Floor 1
- 09:58:12Edge
Panel ID 17 busbar temperature above baseline (61.3 °C)
- 09:55:03Sistem
Inspection data sync to server successful (24 records)
- 09:47:55Edge
Slight temperature rise on Panel ID 9 (45.2 °C), normal
- 09:41:20Operator
Operator 1 initiated mission MG-2026-05-22-02
- 09:30:00Sistem
Scheduled mission MG-2026-05-22-02 started automatically
- 09:12:44Robot
Obstacle detected in corridor, route recalculated
- 08:40:10Robot
Returned to dock, battery charging started
- 08:12:05Sistem
Thermal emissivity calibration complete (value 0.95)
- 08:00:00Operator
Operator 1 logged in to dashboard
